★★★★★ 5 Star Rated 15+ Years Estimating $1M PI Insurance No Lock-In Contracts Australia-Wide · Fully Remote
(08) 6156 9550eagle_enquiries@outlook.com
Home All Services How It Works Pricing Calculator Blog About FAQ Service Areas

Concrete

Concrete Estimating Decorative Concrete Brick Paving

Trades

Earthworks Estimating Bricklaying Estimating Carpentry Estimating Plumbing Estimating Electrical Estimating Roofing Estimating Civil Estimating Landscaping Estimating Termite Treatment

Finishes & Linings

Plastering Estimating Painting Estimating Tiling Estimating Waterproofing Estimating Ceilings Estimating Insulation Estimating Texture Coating Blinds Estimating

Deliverables

Quantity Takeoff & BOQ Construction Programs Progress Claims & Variations Sub-Contract Reviews Residential Estimating Commercial Estimating Industrial Estimating Get a Quote
Concrete · Australia-Wide

Brick Paving Estimating & Paver Counts

Paver counts worked from the actual lay pattern, with base course and bedding sand volumes, edge restraint by the metre and cutting counted where the pattern meets a boundary.

15+
Years Estimating
20+
Trades Covered
24hr
Turnaround
$1M
PI Insurance
Free
First Estimate
✓ First estimate free
✓ 24hr turnaround on most residential jobs
✓ $1M professional indemnity cover
✓ No lock-in contracts
✓ Tax deductible
Why It Is Different

Base and cutting are where paving jobs lose money

The pavers are the visible cost and rarely the problem. The base course volume and the cutting are what turn a paving job from profitable to marginal, and both get glossed over when a job is priced per square metre.

We quantify the base and bedding by volume from the specified depths, count the pavers from the lay pattern with real waste, and count the cuts where the pattern meets a boundary. Herringbone against a curved edge is a very different job to a stretcher bond in a rectangle.

The Scope

What we do on a paving job

Areas are measured off the site plan by paving type and by lay pattern, with the paver size taken from the schedule. Area converts to paver counts and then to pallet counts, with waste set by the pattern and by how much of the perimeter is curved or angled.

Below the pavers: excavation volume to the specified subgrade level, base course volume at the specified compacted depth with a compaction allowance, geotextile by area where specified, and bedding sand by volume at the specified thickness.

Then the items around the edges: edge restraint or haunching by the metre, jointing sand by area, cuts counted at every boundary, curve and penetration, and any drainage grates, pits or channel that the paving has to work around.

Line By Line

Every item measured, and why it matters

Nothing here is an allowance. Each line is measured off your drawings in its own unit, so you can check it against the plan yourself.

What a paving estimate covers
ItemHow it is measuredWhy it matters
Paving areaBy type and lay pattern off the site planPattern and paver size drive count and waste
Paver countArea plus waste converted to pavers and palletsPavers come by the pallet, and dye lots matter
ExcavationVolume to subgrade level, with disposalBase depth plus bedding plus paver decides the dig depth
Base courseCompacted volume at specified depth, plus compaction allowanceLoose volume exceeds compacted volume every time
GeotextileArea where specified over soft subgradeCheap insurance, and specified more often than it is priced
Bedding sandVolume at specified thicknessA small depth error across a big area is a lot of sand
Edge restraintLinear metres of haunching or restraint by typeWithout it the paving spreads and the job fails
CuttingCounted at boundaries, curves and penetrationsCurves and diagonal patterns multiply the cuts
Jointing sandArea by joint width and sand typePolymeric sand costs considerably more than plain
The Detail

Pattern versus waste and cutting

Pattern versus waste and cutting
Lay patternTypical wasteCutting
Stretcher bondAround 5%Half cuts at row ends, mostly reusable
Stack bondAround 5%Straightforward perimeter cuts
Herringbone 45°Around 10–15%Raking cuts on every boundary
Herringbone 90°Around 10%Cuts at perimeter only
BasketweaveAround 10%Module must fit or perimeter cuts increase
Circle / featureAround 15%+Kit based, heavy cutting at the surround

Compaction changes the volume you order

Base course is specified as a compacted depth, but it is delivered loose. Ordering to the compacted volume leaves you short, and the shortfall shows up as either a thin base or an extra delivery you did not price.

We show the compacted volume and the loose ordering volume as separate figures, so the base line item matches what actually goes on the truck. On driveways carrying vehicles this is the item that decides whether the paving stays flat.

How It Works

From your plans to a priced spreadsheet

The same five steps on every job, whether it is a single slab or a full tender package.

  1. Send us the plans

    Email the architectural and structural drawings, the specification and the scope of works in whatever format you have — PDF, DWG, or photos of a marked-up set. If something is missing we will tell you before we start, not after.

  2. We measure the brick paving scope

    Areas are measured off the site plan by paving type and by lay pattern, with the paver size taken from the schedule. Area converts to paver counts and then to pallet counts, with waste set by the pattern and by how much of the perimeter is curved or angled.

  3. Colour-coded markup you can actually check

    Every measured item gets its own colour and legend entry on the drawing. When the takeoff comes back you can see exactly what was counted and what was not, so you are never asked to trust a number you cannot trace. This is the part clients tell us they did not know they needed until they had it.

  4. A live Excel sheet with your own rates in it

    The takeoff is delivered as a working spreadsheet, not a locked PDF. Your rates sit in their own column, so you can change a supply price or a labour rate and watch the total move. Plug in your own numbers and the sheet is yours to reuse on the next job.

  5. Cross-check, then deliver

    Quantities are re-measured independently and cross-checked against the drawing before anything leaves here. You get the marked-up plans, the priced spreadsheet and a plain-English note on anything we flagged as unclear or excluded.

You keep the working file

The takeoff arrives as a live Excel spreadsheet with the colour-coded marked-up plans beside it. Your rates go in your own column, so you can plug in your own supply and labour numbers and reuse the sheet on the next job. Nothing is locked.

What it costs

First estimate free. After that the fee is confirmed in writing as a fixed amount before any work starts. No retainer, no subscription, no lock-in contract. Full pricing detail here →

Typical Work

Paving we price every week

Driveways carry vehicles, so the base is not optional

A path and a driveway can use the same paver and need very different bases. A driveway crossover carrying vehicle loads needs a deeper compacted base, and where a council crossover is involved there are usually specified requirements to meet.

We measure the base depth by use rather than at one figure across the site, and we note where a crossover or a vehicle-loaded area drives a deeper build-up, so the base line is defensible if it is queried.

Standards

What we measure against

Quantities are measured against the standards and the specification for your job. Where a drawing and a standard disagree, we flag it rather than quietly picking one.

Australian Standards referenced on brick paving work
StandardCoversRelevance
AS 3727Guide to residential pavementsPavement design and base requirements
AS 4455Masonry units and segmental paversPaver classification and properties
AS 1289Methods of testing soilsSubgrade and compaction testing
Costly Mistakes

Where brick paving quotes usually go wrong

None of these are unusual. They are the things that get missed when a quote is put together at 9pm after a full day on the tools.

FAQ

Brick Paving estimating questions

If your question is not here, email it through and you will get a straight answer, not a sales call.

Both, with the paver count and pallet count worked at the specified paver size after waste. Pavers are bought by the pallet and they come in dye lots, so running short mid-job can leave a visible colour change.

By compacted volume at the specified depth, with the loose ordering volume shown separately. Base is specified compacted and delivered loose, so ordering to the compacted figure always leaves you short.

Considerably. It changes both the waste allowance and the number of cuts. A 45 degree herringbone against a curved edge can need three times the cutting of a stretcher bond in a rectangle, and cutting is labour.

Yes, by linear metre and by type — concrete haunching, proprietary restraint or a soldier course. Paving without edge restraint spreads, so it is a line item on every job we price.

Yes. Excavation volume is worked to the subgrade level implied by the base, bedding and paver thickness, with disposal quantified separately since spoil cartage is a real cost with its own rate.

The site plan with the paving extents and levels, and the finishes schedule with the paver type, size and lay pattern. Existing and finished levels help most, because they drive the excavation.

Most residential paving packages come back within 24 hours of the plans arriving. Large commercial carpark and hardstand packages take longer, and we confirm the timing up front.

Related

Other trades and deliverables

Most jobs cross more than one trade. We can price the whole package in one spreadsheet.

See all 20+ trades we estimate →

Send through your brick paving plans

Your first estimate is free. Email the drawings and the scope, and you will have a marked-up takeoff and a priced spreadsheet back within 24 hours on most residential jobs. Prefer to talk first? Reply with "KEEN" and your number.

Get My Free Estimate →