★★★★★ 5 Star Rated 15+ Years Estimating $1M PI Insurance No Lock-In Contracts Australia-Wide · Fully Remote
(08) 6156 9550eagle_enquiries@outlook.com
Home All Services How It Works Pricing Calculator Blog About FAQ Service Areas

Concrete

Concrete Estimating Decorative Concrete Brick Paving

Trades

Earthworks Estimating Bricklaying Estimating Carpentry Estimating Plumbing Estimating Electrical Estimating Roofing Estimating Civil Estimating Landscaping Estimating Termite Treatment

Finishes & Linings

Plastering Estimating Painting Estimating Tiling Estimating Waterproofing Estimating Ceilings Estimating Insulation Estimating Texture Coating Blinds Estimating

Deliverables

Quantity Takeoff & BOQ Construction Programs Progress Claims & Variations Sub-Contract Reviews Residential Estimating Commercial Estimating Industrial Estimating Get a Quote
Finishes & Linings · Australia-Wide

Plastering Estimating & Sheet Counts

Wall and ceiling areas measured room by room, converted to sheet counts at the specified size, with cornice, stopping, and every special-purpose board on its own line.

15+
Years Estimating
20+
Trades Covered
24hr
Turnaround
$1M
PI Insurance
Free
First Estimate
✓ First estimate free
✓ 24hr turnaround on most residential jobs
✓ $1M professional indemnity cover
✓ No lock-in contracts
✓ Tax deductible
Why It Is Different

Sheets, not square metres

Plasterboard gets ordered in sheets, so an estimate in square metres leaves you doing the hard part yourself. We convert area to sheet counts at the size and thickness specified, which also exposes where a different sheet length would cut less waste.

Special-purpose board is where plastering quotes go wrong most often. Wet area, fire-rated, acoustic and impact-resistant board all cost differently and all cover different parts of the same building, so each gets its own area and its own line.

The Scope

What we do on a plastering job

Walls and ceilings are measured room by room from the floor plan and the ceiling heights on the sections. Openings are deducted at actual size, and raked or cathedral ceilings are measured on the slope rather than in plan.

Areas convert to sheet counts at the specified sheet size, with waste set by how the room dimensions cut. Board type is split out: standard, wet area, fire-rated, acoustic and impact-resistant each get their own area, because averaging them is how a bathroom-heavy job loses money.

Then the linear and consumable items: cornice by the metre by profile, external corner bead, control joints, adhesive, screws, and stopping compound by coat. Render is measured separately by area and substrate, since the substrate changes the preparation and the coat build-up.

Line By Line

Every item measured, and why it matters

Nothing here is an allowance. Each line is measured off your drawings in its own unit, so you can check it against the plan yourself.

What a plastering estimate covers
ItemHow it is measuredWhy it matters
Wall liningArea room by room, openings deducted at actual size, by board typeBoard type is the biggest price variable and it changes room to room
Ceiling liningArea by room, with raked ceilings measured on the slopeA cathedral ceiling measured in plan is short by the pitch factor
Sheet countArea converted to sheets at the specified size and thicknessYou order sheets. An estimate in square metres leaves the conversion to you
Wet area boardArea to bathrooms, laundries and kitchens, kept separateCosts more per sheet and is required by code in defined areas
Fire and acoustic boardArea by rated system, with the system referenceA rated system has a specified build-up — you cannot substitute the board
CorniceLinear metres by profile, with internal and external mitres countedProfile changes both material cost and fixing time considerably
Stopping and finishingJoint metres and coat count, plus compound and tapeA level-4 or level-5 finish is materially more labour than a standard set
RenderArea by substrate and coat build-up, plus beads and meshRender on blockwork and render on AAC are different preparations
AccessCeiling heights and where a trestle or scaffold is neededHigh ceilings slow ceiling work down substantially
The Detail

Board types we keep on separate lines

Board types we keep on separate lines
Board typeWhere it goesWhy it matters
StandardGeneral walls and ceilingsThe base rate everything else is compared to
Wet areaBathrooms, laundries, kitchensRequired by code and dearer per sheet
Fire-ratedParty walls, shafts, garage-to-dwelling wallsPart of a tested system — no substitution
AcousticBedrooms, party walls, home theatresOften specified with resilient channel as well
Impact-resistantCorridors, schools, commercial circulationCommon in commercial specs, rare in residential
Ceiling boardCeilings at wider batten spacingDifferent thickness to wall board on the same job

The finish level is a labour decision

Stopping to a standard residential set and stopping to a level-5 finish for a gloss paint or a raking light are very different amounts of labour on identical square metres. The finish level belongs in the specification, and if it is not there we ask, because guessing it either loses you money or loses you the job.

Same with control joints. On long walls and large ceilings they are a code and manufacturer requirement, and they add both material and time.

How It Works

From your plans to a priced spreadsheet

The same five steps on every job, whether it is a single slab or a full tender package.

  1. Send us the plans

    Email the architectural and structural drawings, the specification and the scope of works in whatever format you have — PDF, DWG, or photos of a marked-up set. If something is missing we will tell you before we start, not after.

  2. We measure the plastering scope

    Walls and ceilings are measured room by room from the floor plan and the ceiling heights on the sections. Openings are deducted at actual size, and raked or cathedral ceilings are measured on the slope rather than in plan.

  3. Colour-coded markup you can actually check

    Every measured item gets its own colour and legend entry on the drawing. When the takeoff comes back you can see exactly what was counted and what was not, so you are never asked to trust a number you cannot trace. This is the part clients tell us they did not know they needed until they had it.

  4. A live Excel sheet with your own rates in it

    The takeoff is delivered as a working spreadsheet, not a locked PDF. Your rates sit in their own column, so you can change a supply price or a labour rate and watch the total move. Plug in your own numbers and the sheet is yours to reuse on the next job.

  5. Cross-check, then deliver

    Quantities are re-measured independently and cross-checked against the drawing before anything leaves here. You get the marked-up plans, the priced spreadsheet and a plain-English note on anything we flagged as unclear or excluded.

You keep the working file

The takeoff arrives as a live Excel spreadsheet with the colour-coded marked-up plans beside it. Your rates go in your own column, so you can plug in your own supply and labour numbers and reuse the sheet on the next job. Nothing is locked.

What it costs

First estimate free. After that the fee is confirmed in writing as a fixed amount before any work starts. No retainer, no subscription, no lock-in contract. Full pricing detail here →

Typical Work

Plastering we price every week

Ceiling height changes everything above the walls

A 2.4 metre ceiling and a 3.0 metre ceiling are not a 25 per cent difference — they are a different way of working. Sheets need two people, trestles come out, and the sheet layout may change to avoid an extra joint.

We read ceiling heights off the sections rather than assuming standard height, and note where trestle or scaffold work is required so the labour allowance is honest.

Standards

What we measure against

Quantities are measured against the standards and the specification for your job. Where a drawing and a standard disagree, we flag it rather than quietly picking one.

Australian Standards referenced on plastering work
StandardCoversRelevance
AS/NZS 2589Gypsum linings — application and finishingFixing, jointing and finish levels
AS 2311Guide to the painting of buildingsSurface preparation the finish level has to satisfy
AS 3700Masonry structuresRender over masonry substrates
Costly Mistakes

Where plastering quotes usually go wrong

None of these are unusual. They are the things that get missed when a quote is put together at 9pm after a full day on the tools.

FAQ

Plastering estimating questions

If your question is not here, email it through and you will get a straight answer, not a sales call.

Both. The area is there so you can check it, and the sheet count is there so you can order. Counts are worked at the sheet size and thickness in the specification, and we note where a different sheet length would cut less waste.

Always, along with acoustic and impact-resistant board. Each gets its own measured area and its own line. Rated systems are listed with the system reference, because the board cannot be substituted without breaking the rating.

Yes, by linear metre by profile, with internal and external mitres counted. Profile makes a real difference to both material cost and fixing time, so a 90mm cove and a decorative profile are never on the same line.

Yes. Render is measured by area against its substrate, with the coat build-up, beads and mesh from the specification. Blockwork, brickwork and AAC all need different preparation, so they are measured separately.

None — we ask. If the specification nominates a finish level we work to it; if it does not, we list the level we have priced so you can adjust before quoting. It is too large a labour difference to guess.

The floor plan, the sections showing ceiling heights, the room finishes schedule and the specification. For fire and acoustic work we also need the rated system references off the drawings.

Most residential lining packages come back within 24 hours of the plans arriving. Commercial partition packages take longer — we confirm the timing when we have the drawings.

Related

Other trades and deliverables

Most jobs cross more than one trade. We can price the whole package in one spreadsheet.